Our Process
Step #1
A pattern of small holes are drilled through the sunken concrete.
Step #2
A limestone slurry is pumped hydraulically under the slab. Once the void is filled, it pressurizes and lifts the slab to the desired position.
Step #3
The small holes are patched with a durable cement.